This project encompassed a 500 kV transmission line, 3 x 500 kV transmission lines to interconnect Jirau HPP with Porto Velho‘s substation and the connection to the national power grid.
Fast track solution for LNG supply to Germany
Feasibility, Light-FEED Study & Owner’s Engineer mission